Monday, April 16, 2012

desk crit




these images represent an idea or "frame work" of ideas establishing potential structural systems that could be defined as details.

Wednesday, April 11, 2012

program ii















this post consists of_program specs, case studies, process of design intent, and inconclusive design intentions

Monday, March 5, 2012

Saturday, February 25, 2012

progress

final node. wearhouse/storage/distribution.

 imagine several storage cylinders behind the building.

progress



node_3-water treatment.


Bio-Clear System Specifications
          
  Model              Operating  Capacity      Dimensions              Flow EQ           Sludge Holding
BC-3-ES               3000(GPD)             9'6"H x 8'W x 16'L       2'6"                       2'
 Aeration Tank             Clarifier          Shipping Weight (lbs.)
           7'                       4'6"                             5900
http://www.ecologixsystems.com/system-bio-clear.php

Friday, February 24, 2012

progress

basic idea of what the electric locomotive would look like.

Wednesday, February 15, 2012

miltons_monday pinup

proposal for nodes 1 & 2. this document includes section, plans, perspectives, and elevations.

Monday, February 6, 2012

Progress

rough idea of what main node could look like. x-ray enables a basic understanding of structural intent.